Parnassus Heights Construction Update: Early 2024

Construction continues to run at full steam at Parnassus Heights. This quarterly update shares what you need to know about major construction impacts on campus. Dates and other project details are subject to change. The next update will be available in spring 2024.

You can find community updates on UCSF construction and design through UCSF Community and Government Relations (CGR). Sign up for UCSF CGR updates for Parnassus Heights at www.ucsf.edu/cgr/signup for the latest updates.


New Hospital at Parnassus Heights

New Hospital at Parnassus Heights construction site as of February 22, 2024.
New Hospital at Parnassus Heights construction site as of February 22, 2024. 

To serve the city with world-class care for the next century, UCSF is constructing the New Hospital at Parnassus Heights (NHPH), a 15-story hospital on the Parnassus Heights campus on the former Langley Porter Psychiatric Hospital (LPPH) site. Construction will continue through 2029, with the new hospital opening in 2030. 

Between February 2022 and April 2027, 32 major projects are required to prepare for demolition of LPPH and construction of the new hospital building. We are communicating impacts of this work broadly to UCSF faculty, staff, learners, patients and visitors, and the community. 

The new hospital is part of the Comprehensive Parnassus Heights Plan.

Construction Hours
  • 7 a.m. to 5 p.m. Monday through Friday
  • 8 a.m. to 5 p.m. Saturday (as needed)
  • 8 a.m. to 5 p.m. for noisy work
Expected Project Completion Date

2030

Project Contact

[email protected] or 415-476-6577

Latest Updates


Parnassus Research and Academic Building

PRAB construction site as of February 14, 2024
Parnassus Research and Academic Building site as of February 14, 2024.

Construction will continue through 2028 on the former UC Hall site to build a new state-of-the-art Parnassus Research and Academic Building that will provide a new home for the School of Nursing, an expanded education space, and space for multiple health and science disciplines. The new building will encourage collaboration and support UCSF staying at the cutting edge of discovery, learning and care.

The building also will serve as temporary spaces for research and academic groups as the campus undergoes several major improvements for the Comprehensive Parnassus Heights Plan through 2030. 

Construction Hours
  • 7 a.m. – 5 p.m. Monday through Friday
  • 8 a.m. – 5 p.m. Saturday (as needed)
  • 8 a.m. – 5 p.m. for noisy work
Expected Project Completion Date

Early 2028

Project Contact

[email protected] or 415-476-6577

Latest Updates 


Parnassus Central Campus Site Improvements

Parnassus Central Campus Site Improvements diagram of site
Site map of Pararnassus Central Campus Site Improvements program

UCSF is embarking on an important endeavor to create a welcoming pedestrian connection that leads to the “heart of campus” at Parnassus Heights. The Parnassus Central Campus Site Improvements (PCCSI) program will create a connection with landscaping and hardscaping between the new PRAB Promenade and Saunders Court, across the footprint of the existing School of Nursing building, which will be demolished starting in late 2024, and surrounding area.

The project will provide extensive site improvements in the central core of campus, including extending utilities to support existing and future buildings, providing opportunities for improved energy efficiency and furtherance of UCSF’s fossil-fuel-free initiatives. This work will further the Comprehensive Parnassus Heights Plan (CPHP) in three key ways.

  1. Extending utility infrastructure to support west campus development
  2. Complying with UCOP Seismic Policy (decant and demolition of School of Nursing building) 
  3. Creating pedestrian connections from the PRAB Promenade to Saunders Court

Last year, more than 300 UCSF community members participated in the survey to provide input that will help guide the upcoming design process for the project. UCSF Real Estate greatly appreciates the participation of the UCSF community in this effort.

Learn more about the program and plans.

Project Contact

UCSF Real Estate Shelia Laub | [email protected]

Latest Updates


Health Sciences Instruction and Research (HSIR) Towers Improvements Program

HSW Tower with shrink wrap for an improvement program, as of February 12, 2024.
Shrink wrap removal will start in March 2024 for the HSW and HSE Towers. 

Construction is underway to improve the Health Sciences Instruction and Research (HSIR) East and West towers. The HSIR complex is made up of two, 16-floor towers with an elevator and corridor that connects the towers. About 90% of the building includes labs and research space. The HSIR Improvements Program consists of three projects: 

  1. HSIR Exterior Ledge Repairs: Full repair and recoating of the exterior concrete ledges for Health Sciences West (HSW) and Health Sciences East (HSE). The exterior repairs will improve the building’s safety. 
  2. HSIR Life Safety Improvements: Provide a fully sprinklered building, install fire sprinklers in currently non-sprinklered areas, correct fire sprinkler pipe pressure deficiencies, add sprinkler heads to chemical fume hoods, and extend existing standpipes on the rooftops for fire department access.  
  3. HSIR Seismic Improvements: Improve the seismic performance rating of HSW and HSE by making whole-building structure improvements including installing seismic dampers, column splicing at level 5 of both towers, and upgrading the seismic joints and utility restraints. This project will make the building safer in the event of an earthquake and will better protect UCSF labs and experiments.
Construction Hours
  • 7 a.m. – 5 p.m. Monday through Friday for interior and exterior work
  • 10 p.m. – 6 a.m. Monday through Friday for interior fire sprinkler work
Expected Project Completion Date
  • Late 2024 for life safety and seismic projects
  • Early 2025 for exterior repairs
Project Contact

[email protected]

 

Latest Updates


Other Construction Projects at Parnassus Heights